COMMUNICATION
Installing Communication Options and Control Terminals
108
Eaton BladeUPS (12 kVA) User's Guide
To install the communication options and control terminals:
1.
Install the appropriate X-Slot card and/or necessary cable(s) (see Figure 73 and
Figure 74).
2.
Connect the cables to the appropriate location.
See "Communication Options" on page 109 or "Control Terminals" on page 111
for detailed information.
3.
Route and tie the cable(s) out of the way.
4.
Continue to "Operation" on page 93 to start up the UPS.
S
164201649 Rev 6 www.eaton.com/powerqualtiy
Figure 74. Installing Communication Cables