Chapter 3

Inspecting the Equipment

Floor Loading

UPS Setup

This chapter describes:
S
Equipment inspection
S
Floor loading and clearances
S
Unloading the cabinet(s)
S
Selecting an installation option
The instructions are intended for the chief operator/system supervisor, electrical
consultants, and installation electricians. Local regulations and electrical code must be
followed during the UPS installation.
If any equipment has been damaged during shipment, keep the shipping and packing
materials for the carrier or place of purchase and file a claim for shipping damage. If
you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim
within 15 days to your service representative.
NOTE Check the battery recharge date on the packaging label. If the date has expired and the batteries
were never recharged, do not use the UPS. Contact your service representative.
When planning the installation, consider the UPS weight for floor loading. The
strength of the installation surface must be adequate for point and distributed
loadings. The approximate weights are shown in the following table.
Standard Model Floor Loadings (2-High/3-High Cabinets)
Powerware 9155
2-High UPS
3-High UPS
3-High UPS with
Isolation Transformer
2-High EBM
3-High EBM
®
EATON Powerware
9155 UPS (8–15 kVA) User's Guide
Maximum
Point Loading
Weight (lb)
(lb/in
352
88
590
148
558
140
480
120
710
178
S
164201553 Rev F www.powerware.com
Distributed
2
2
)
Loading (lb/ft
)
166
278
263
226
335
7