Chapter 2 Unpacking the Library

Receiving the Library

Figure 6 Space Requirements
for Unloading
Unloading Area
(Minimum)
6
Receiving the Library
Follow these guidelines to properly receive the crated library:
Move the crated library as close to the final installation site as possible.
Allow a minimum of six feet in front of the off-load side of the pallet to
ensure that there is enough space to place the ramp used for removing
the library
Library
Pallet Ramp
32"
24"
• Inspect the crate and packing materials for any damage that may
have occurred during shipment. Report any damage to the
shipping company immediately.
ACL 4/52 Facilities Planning and Installation Guide
9'
38"
2
Pallet
TA00129a