Reinstalling The Left Cosmetic Panel; Moving The Library Onto The Shipping Pallet; Securing The Library To The Pallet - Quantum ACL 4/52 Installation Manual

Automated tape library for dlt cartridges
Hide thumbs Also See for ACL 4/52:
Table of Contents

Advertisement

Reinstalling the Left
2
Cosmetic Panel
Moving the Library
onto the Shipping
2
Pallet
Securing the Library
2
to the Pallet
To reinstall the left cosmetic panel:
1 Rest the top lip of the left side panel on the library frame.
2 Push the panel toward the front of the library and insert the frame
buckles into the retention tabs.
3 At the back of the library, insert and tighten the three screws to
secure the left side panel to the back of the library frame.
4 Unplug the power cord from the library and the power source.
To move the library onto the shipping pallet:
1 Raise the library's leveling feet by rotating each foot clockwise
until fully retracted.
2 Position the pallet to load the library and secure the two ramp
sections to the pallet using the Velcro strips.
3 Unfold the shipping bag and align the white tape to the pallet
where the library casters will roll onto the pallet.
4 Roll the library onto the pallet and into the shipping bag.
5 Observe all cautions and guidelines in "Moving the Library to the
Installation Site" on page 10.
6 Seal the shipping bag by folding the seam over and taping the
edge.
7 Disconnect the ramp sections from the pallet and slide them
underneath the library.
8 Install the stop block in front of the library front casters and secure
it to the Velcro fasteners.
To secure the library to the pallet:
1 Place all accessories (cables, manuals, installation hardware, and so
forth) in the accessories tray.
You must provide separate shipping container for the tape
cartridges.
2 Place the accessories tray and foam cap on top of the library (see
figure 7 on page 7).
3 Wrap the cardboard box around the library and secure it using the
cardboard retaining clips.
4 Place the cardboard top cover securely over the cardboard box.
5 Install steel bands to secure the library and packing material to the
pallet.
ACL 4/52 Facilities Planning and Installation Guide
Chapter 2 Unpacking the Library
Packing the Library for Shipment
19

Advertisement

Table of Contents
loading

Table of Contents