Chapter 2 Unpacking the Library
Unpacking the Library
Figure 8 Unpacking the
Library
8
6 Slide out the two pallet ramp sections located underneath the
library and secure them to the pallet using the Velcro straps.
7 Carefully cut the shipping bag vertically along the heat-seal seam.
8 Inspect the library for damage that may have occurred during
shipment.
Accessories Tray
Foam Cap
Shipping Bag
Stop Block
Pallet Ramp