Receiving the Library
Quantum|ATL 7100 Series Facilities Planning and Installation Guide
Unpacking and Moving the
2
This chapter describes how to unpack and move the library to the
final installation area.
The procedures in this chapter must be performed in
Caution:
the order in which they appear in this chapter.
When you receive the crated library, unload it as close to the final
installation area as possible and allow approximately ten feet in
front of the off-load side of the pallet. This ensures that there is
enough space to lower the ramp before removing the library from
the pallet.
Also make sure that the room has a minimum ceiling height of
eight feet to provide clearance for removal of the box from the
pallet.
Chapter 2
Library
2
11