Installing The Primary Gear; Installing The Clutch Bearing; Installing The Kickstarter Shaft; Installing The Centrifugal Force Clutch - KTM 50 SX 2010 Repair Manual

Table of Contents

Advertisement

30/ASSEMBLING THE ENGINE

Installing the primary gear

17.4

Installing the clutch bearing

17.5

Installing the kickstarter shaft

17.6

Installing the centrifugal force clutch

17.7

Tightening the nut of the primary gear

17.8
Position the O-ring.
Mount washer
Mount spring washer.
Position primary gear
Mount nut
Guideline
Nut, primary gear
300497-10
Mount collar sleeve
300486-10
Position kickstarter spring
Mount washer
Hook the kickstarter spring into kickstarter shaft
The kickstarter spring is spring-loaded by turning the kickstarter shaft clock-
wise.
Insert the kickstarter shaft into the engine case and let it engage.
300496-10
Position the centrifugal force clutch
300491-10
Hold the clutch in place with special tool
Gear segment (45229081000) (
Tighten nut
Guideline
Nut, primary gear
300730-10
.
.
but do not tighten yet.
M10x1.25
and needle bearing
and hook it in at area
.
.
p. 143)
.
M10x1.25
40 Nm
Loctite
®
(29.5 lbf ft)
.
.
.
.
40 Nm
Loctite
®
(29.5 lbf ft)
85
243™
243™

Advertisement

Table of Contents
loading

This manual is also suitable for:

50 sx mini 2010

Table of Contents