Parallel Function - ITech IT8700P+ Series User Manual

Dc programmable electronic loads
Table of Contents

Advertisement

Recall testing files and Run testing files
The following way can make you fast recall the edited testing files from
EEPROM after re-powering.
1.
Press
key to confirm.
Function Mode
Recall OPP
Edit OPP
Exit
2.
Press
3.
Press
press
Fixed
OPP Test
4.
Press
CH01 CC OFF
Vdc=0.0000V
Adc=0.0000A
OPP Test Stop
5.
Press the
CH01 CC OFF
Vdc=0.0000V
Adc=0.0000A
OPP Test Run
6.
End test. If within range, pass the test and the board will display as follows:
CH01 CC OFF
Vdc=0.0000V
Adc=0.0000A
Pass: 0.0000A

4.17 Parallel Function

The IT8700P+ series load provides a maximum power of 600W, and users can
connect multiple modules in parallel to expand the current and power of the
load. This series of loads can be connected in parallel with up to 16 channel
modules, up to 4800W.
Operation steps
The following is an example of how to implement the parallel connection
function with 3 modules in parallel (1 master and 2 slaves). Where Analog is the
analog signal connection for parallel connection.
1.
Connect the instruments according to the following diagram.
▼ ▼
Shift
Shift
+5,press
▼ ▼
to move to <Recall OPP > to recall the saved testing files.
▲ ▲
key to select <Function Mode>, press
▲ ▲
key to select <OPP Test>, press
Esc
Esc
to exit.
Trig
Trig
key to trigger and start the OPP test.
Copyright © Itech Electronic Co., Ltd.
key to select <OPP Test >, press
Enter
to confirm.
Operations introduction
Enter
Enter
key to confirm,
68

Advertisement

Table of Contents
loading

This manual is also suitable for:

It8700 seriesIt8700p series

Table of Contents