Chapter1 Inspection and Installation
This chapter mainly explains to the user how to do the inspection after receiving
the package, and introduces the installation size and steps for the mainframe
and modules.
1.1 Verifying the Shipment
Unpack the box and check the contents before operating the instrument. If
wrong items have been delivered, if items are missing, or if there is a defect
with the appearance of the items, contact the dealer from which you purchased
the instrument immediately.
The package contents include:
Item
Electronic Load x1
Power cord
USB
Ex-factory Test
Report
1.2 Installation Size Introduction
The instrument should be installed at well-ventilated and rational-sized space.
Please select appropriate space for installation based on the electronic load
size(unit: mm).
Qty
Model
.
IT8700 series
IT-E171/IT-E172
/
x1
IT-E173/IT-E174
x1
-
x1
-
NOTE
Upon verification of the shipment, keep the package and relevant contents thereof in a
safe place. When returning the instrument for warranty service or repair, the specified
packing requirements shall be met.
Copyright © Itech Electronic Co., Ltd.
Inspection and Installation
Remarks
For the specific models included in this
series, refer to
2.1 Brief
User may select an appropriate power
cord that matches the specifications of
power socket used in the area. See
the Section
1.5 Connecting the Power
Cord
for details.
-
It is the test report of the instrument
before delivery.
Introduction.
1
Need help?
Do you have a question about the IT8700P+ Series and is the answer not in the manual?
Questions and answers