Active Channel
0:□□□□□□□□
1:□7 □5 □3 □ 1
5.
Select the steps needed to test, if you want to test 4 steps, please press in
order 1/2/3/4, 0 stands for the tenth step. If you want to cancel a step,
press again the numeric keys you want to cancel. Press
Active SEQ.
0 9 8 7 6 5 Y Y Y Y
6.
In the 4 steps, if you want to suspend, e.g. you want to suspend step 2,
press numeric key 2, press
Pause Sequence
□□□□□□ 4 3 Y 1
st
7.
Edit the 1
step of the 4 steps: determine whether need short circuit testing
in channel 3 and 5, for example, channel 3 need short circuit testing, press
number 3. press
SEQ01 Short CH
0:□□□□□□□□
1:□□□5□Y□□
8.
Set with-load time, if you want to load 2S, press numeric key 2, then press
Enter
Enter
to confirm
SEQ01 On Time
=
2.0
S
9.
Set unloading time, if you need 2S, press numeric key 2, then press
Enter
Enter
to confirm
SEQ01 Off Time
=
2.0
S
10. Set testing delay time, e.g. 1S, press numeric key 1. Tpf is testing delay
time.
SEQ01 P/F Delay
Time = 1.0 S
Tpf is testing delay time
11. Repeat 7)~10) ,set the rest 3 steps' loading/unloading time
12. Set the condition when stop testing, Complete mean stop test When all the
steps are completed, Failure mean stop test when the testing fails. Press
▲ ▲
▼ ▼
、
keys to select, such as <Complete>, press
confirm.
Stop Condition﹥
﹥Complete
Failure
Copyright © Itech Electronic Co., Ltd.
Enter
Enter
to confirm
Enter
Enter
to confirm
Operations introduction
Enter
Enter
to confirm。
Enter
Enter
key to
60