HPE ProLiant DL20 Gen10 User Manual page 141

Hide thumbs Also See for ProLiant DL20 Gen10:
Table of Contents

Advertisement

Riser slot 1
Riser slot 2
13. Install the riser cage.
14. Connect all necessary internal cabling to the expansion board.
For more information on these cabling requirements, see the documentation that ships with the option.
15. Install the access panel .
16. Install the server into the rack .
17. Connect all necessary external cabling to the new expansion board.
For more information on these cabling requirements, see the documentation that ships with the option.
18. Connect all peripheral cables to the server.
19. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
20. Power up the server .
21. If removed, install the front bezel .
The installation is complete.
Installing an expansion board
141