HPE ProLiant DL20 Gen10 User Manual page 111

Hide thumbs Also See for ProLiant DL20 Gen10:
Table of Contents

Advertisement

10. Connect the serial port cable to the M.2 SSD/dedicated iLO/serial port enablement board .
11. Install the riser cage.
12. Install the access panel .
13. Install the server into the rack .
14. Connect all peripheral cables to the server.
15. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
16. Power up the server .
17. If removed, install the front bezel .
The installation is complete.
Installing the serial port cable
111

Advertisement

Table of Contents
loading

Table of Contents