HPE ProLiant DL20 Gen10 User Manual page 67

Hide thumbs Also See for ProLiant DL20 Gen10:
Table of Contents

Advertisement

For threaded-hole rack: Insert the rail pins into the rack column holes, and then install the mounting screws.
5. Install the server into the rack .
6. To secure the power cords and other rear panel cables to the rack rail, install the hook-and-loop strap.
The installation is complete.
Installing the rack rail option
67

Advertisement

Table of Contents
loading

Table of Contents