11. Install the optical drive cage assembly in the media bay.
12. Connect the optical drive SATA-power Y-cable .
13. Install the access panel .
14. Install the server into the rack .
15. Connect all peripheral cables to the server.
16. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
17. Power up the server .
18. If removed, install the front bezel .
The installation is complete.
Installing an optical drive in an SFF chassis
95

Advertisement