To connect a DC conductor, follow these steps:
1. Select an M8-size cable lug for the corresponding conductor cross-section.
2. Strip off the end of the conductor so that the remaining insulation reaches up to the cable lug.
3. Fasten the cable lug correctly to the end of the conductor.
4. If necessary, insulate the cable lug sleeve to maintain the minimum clearances and creepage
distance.
5. Insert the cable lug into the terminal DC-
6. Insert the connection bolt through the screw holes of the cable lug and terminal.
7. Tighten the fastening nut with the required torque:
– Size of fastening nut: M8
– Required tightening torque: 20 Nm
6.3.3
Connecting the communication cable
When using the distributed charge points, connect the communication cable to the charging
station.
Requirements
• You have removed the bottom protective cover.
• You have inserted the communication cable into the cabinet.
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC
②
③
or DC+
.
Connecting
6.3 Connecting UC 100