Reposition the charging station on the base area
1. Close the cabinet door.
2. Drive the forks of the forklift from the front or from behind under the bottom of the cabinet.
3. Lift the charging station vertically upwards.
4. Remove the wooden beams.
5. Lower the charging station onto the base area.
Guiding the cables through the cable glands
1. Guide all cables used through the cable glands of the cable gland plate.
2. Slide the cable gland plate to the cutout from which it was removed.
3. Screw the cable gland plate to the cabinet with the four fastening screws.
4. Tighten the cable glands on the cables.
5.5.2

Securing the charging station

After inserting the power cord into the cabinet, attach the charging station to the base area.
Required tools and fasteners
You will need the following tools to secure the charging station:
• Torque wrench
• Socket: Hexagon, SW18
The fastening material is not included in the scope of delivery.
We recommend the following fastening material:
• 6 M18 screws, strength class 8.8
• 6 washers
• 6 fastening elements, for example: Dowel
Fastening points
Use the drill holes in the prepared base (Page 63) to secure the charging station.
The charging station must be screwed to at least 2 of the 3 foundation fastening points on
both the right and the left side.
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC
Mounting
5.5 Installation of UC 300/400
81

Advertisement

Table of Contents
loading

Table of Contents