Siemens SICHARGE UC 100 Operating Instructions Manual page 70

Table of Contents

Advertisement

Application planning
4.6 Transporting the charging station
To transport the charging station to the site with a forklift, proceed as follows:
1. Drive into the transport pallet with the forks on the transverse or longitudinal side.
2. Drive in until the forks protrude on the other side of the pallet.
3. Lift the charging station vertically.
4. Transport the charging station upright to the site.
68
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC

Advertisement

Table of Contents
loading

Table of Contents