Siemens SICHARGE UC 100 Operating Instructions Manual page 61

Table of Contents

Advertisement

Properties of the base area
To ensure the stability of the charging station, the base area must meet the following
requirements:
• Level
• Dry
• Sufficiently solid and capable of bearing the load (e.g. concrete area in quality class C30/37)
Note
Sealing the mounting plate
Seal the mounting plate and the cable openings in the foundation with suitable materials to
prevent moisture, animals and insects from getting inside the station.
Minimum clearances
To enable operation and maintenance and to ensure proper ventilation of the charging station,
you need to maintain the following minimum clearances (in mm):
Figure 4-15
In addition, a minimum clearance of 600 mm between the top of the charging station and
the ceiling of the room is required at the intended location.
SICHARGE UC 100, UC 200, UC 300, UC 400, UC 600, UC 800
Operating Instructions, 10/2022, A5E50828019-AC
Top view of minimum clearances
Application planning
4.4 Application planning of UC 300/400
59

Advertisement

Table of Contents
loading

Table of Contents