8.7 (Optional) Installing Cables in Capacity Expansion
Scenario
NO TICE
● In capacity expansion scenarios, bottom cascading cables must be routed from
the rear of the product.
● Cables outside the device must be routed through cable pipes.

8.7.1 Installing Ground Cables

Ensure that the ground cable is securely connected. Otherwise, electric shocks may
occur.
Procedure
Step 1 Install ground cables.
Issue 01 (2022-07-15)
D ANGER
Copyright © Huawei Technologies Co., Ltd.
8 Electrical Connection
153

Advertisement

Table of Contents
loading

This manual is also suitable for:

Map05a1Mab05b1

Table of Contents