Danfoss Turbocor TT Series Service Manual page 94

Twin-turbine centrifugal series compressors
Hide thumbs Also See for Turbocor TT Series:
Table of Contents

Advertisement

 24.  Re-install the IGV on the compressor and finger-tighten the fasteners.
 25.  Tighten the fasteners in a crisscross pattern to 22 Nm (16 ft.lb.).
Figure 4-70 IGV Housing Installation
 26.  Leak test and evacuate compressor in accordance with standard industry practices.
 27.  Plug in the Feedthrough and Suction Pressure Temperature Sensor Harness.
 28.  Torque the remaining Feedthrough fastener (the one securing the Motor Harness Retainer Clip) to 5 
 29.  Return the compressor back to normal operation.
 30.  Test run the compressor to verify proper operation and movement of the IGV assembly. Refer to Figure 
All IGV assemblies are fully open when the Position Indicator Ball is at the OPEN position.
 
Figure 4-71 IGV Position Indicator
 
Page 94 of 294 - M-SV-001-EN Rev. H 1/23/2023
Nm (44 in.lb.).
4-71   I GV Position Indicator to verify the position of the IGV.
NOTE

Advertisement

Table of Contents
loading

Table of Contents