Figure 1-15 DC Bus Test Harness Connection Diagram (Closed-Top Soft Start)
3. Connect the two (2) plugs of the DC bus test harness into the Soft Start. Refer to Figure 1-13 S oft Start
4. Route the cables through the cable passage on either side of the DC-DC Converter, down into the
For clarity purposes, several components have been removed from Figure 1-16 C able Passage
l
Figure 1-16 Cable Passage
5. Carefully adjust the connectors and harness so that the Top Cover can be reinstalled.
6. Install the top covers. Refer to Section 4.1 C ompressor Covers on page 52.
7. Remove ESD strap from the compressor and yourself.
8. Reapply AC power to the Compressor.
Page 28 of 294 - M-SV-001-EN Rev. H 1/23/2023
(Closed Top) on page 27.
service side. Refer to Figure 1-16 C able Passage.
NOTE