 12.  Verify the DC Bus voltage through the test harness. Refer to Section 4.21.2   D C Bus Voltage Verification 
 13.  Isolate the compressor power as described in Section 1.8   E lectrical Isolation on page 22.
 14.  Remove the DC-Bus test harness and re-install the J2 (250VDC) and J3 (24VDC) (Potted DC-DC) or J4 
 15.  Install the top covers. Refer to Section 4.1   C ompressor Covers on page 52.
 16.  Remove the Service Side Cover. Refer to Section 4.1.3.1   S ervice Side Cover Removal and Installation on 
 17.  Apply compressor power.
 18.  Verify the 250VDC and 24VDC test points on the Backplane.
 19.  Isolate the compressor power as described in the Section 1.8   E lectrical Isolation on page 22. 
 20.  Wait for the LEDs on the Backplane to turn off. 
 21.  Remove all connectors from the Backplane, leaving only the J6 (Inverter cable), J4 (250VDC) and J24 
 22.  Remove the Serial Driver, BMCC, and PWM. Refer to the following sections:
 23.  Apply compressor power.
 24.  Verify the HV+ and the +24 VDC test points on the Backplane.
 25.  Apply compressor power.
 26.  Verify the 250VDC and 24VDC at the J4 and J24 DC-DC Converter output connectors.
 27.  Verify the +17V, +15, +5 and -15 VDC test points on the Backplane.
 28.  Isolate the compressor power as described in the Section 1.8   E lectrical Isolation on page 22. 
 29.  Wait for the LEDs on the Backplane to turn off. 
 30.  Install all connectors.
 31.  Install the PWM, BMCC, and Serial Driver to the Backplane. Refer to the following sections:
Page 270 of 294 - M-SV-001-EN Rev. H 1/23/2023
on page 167.
 
If DC Bus voltage is correct, proceed to Step 13
l
 
If DC Bus voltage is not correct, verify the SCRs
l
 
If the SCRs pass test, replace the Soft Start, then repeat Step 12 
l
 
If one or more of the SCRs test faulty, replace all three of the SCRs then repeat Step 12 
l
 
If the 15VAC is present, proceed to Step 14
l
 
If the 15VAC is not present, replace the Soft Start then repeat Step 13
l
(24VDC) (Open Frame DC-DC) outputs to the DC-DC Converter.
page 54. and remove the Service Side Cover.
 
If both voltages are within +/- 10%, all supply voltages are good
l
 
If either voltage is not within +/- 10%, proceed to Step 19
l
(24VDC) inputs connected.
 
4.26.4   S erial Driver Removal and Installation on page 218
l
 
4.27   B MCC on page 220
l
 
4.28.4   P WM Removal and Installation on page 228
l
 
If all voltages are within +/- 10%, proceed to Step 27
l
 
If either voltage is not within +/- 10%, isolate compressor power and wait for the LED's on the 
l
Backplane to go out, then disconnect the J4 and J24 connectors from the Backplane
 
If either voltage is not within +/- 10%, replace the DC-DC Converter
l
 
If all voltages are within +/-10%, replace the Backplane
l
 
If all voltages are within +/- 10%, proceed to Step 28
l
 
If any voltages at the +17V, +15, +5 and -15 VDC test points are not within +/- 10%, replace the 
l
Backplane