Polaris ACE 900 2017 Service Manual page 90

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
Air Box Installation Procedure
1. Install the air box bottom assembly back into the
engine compartment.
2. Reinstall the two screws
Torque to specification.
TORQUE
Air Box Fastener:
8 ft-lbs (11 Nm)
3. Reinstall the three screws
cargo box..
4. Reinstall the four screws inside the cargo box.
5. Reinstall the air box cover. Verify the cover tabs
engage the air box. Lock the clamps to secure the
cover.
6. Reposition the gear clamps to secure the intake
hoses onto the air box. Tighten gear clamps to
specification.
TORQUE
Air Intake Hose Gear Clamps:
35 in-lbs (4 Nm)
7. Reinstall the maintenance panel in the rear storage
box.
3.14
w
securing the air box.
q
fastening the front of the
9929422 R02 - 2017-2019 ACE 900 Service Manual
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ace 900 2018Ace 900 2019Ace 900 xc 2017

Table of Contents