Polaris ACE 900 2017 Service Manual page 378

Table of Contents

Advertisement

STEERING / SUSPENSION
WALKER EVANS™ SHOCK ASSEMBLY
1. Install new seals and O-rings on the seal head
assembly.
2. Use the appropriate shock rod holding tool and a vise
to mount the shock rod vertically with the threaded
end upward.
Front Shock Rod Holding Tool: 2872429
Rear Shock Rod Holding Tool: PU-50931
3. Install the appropriate Shock Seal Protector Sleeve
over the shaft threads.
Front Shock Seal Protector Sleeve: PU-50939
Rear Shock Seal Protector Sleeve: PU-50952
4. Install seal head assembly onto the shock shaft.
5. Remove the Shock Seal Protector Sleeve.
6. Place the compression valve stack on the rod in the
reverse order of disassembly.
7. Place valve piston on top of the compression stack.
If unsure of the valve stack order, refer to "Shock
Valving" under the "Shock Service Information"
provided earlier in this section.
8.46
NOTE
8. Place a new lock nut onto the shock rod. Torque the
new lock nut to specification.
Do not over torque the nut or damage to the valve stack
can occur.
TORQUE
Lock Nut:
14 ft-lbs (19 Nm)
Make sure "Top-Out" washers are orientated as shown.
9. Front Shocks Only: Assemble the clicker valve
stack on top of the fastener and install the assembly
into the reservoir body. Tighten the valve stack
fastener securely.
9929422 R02 - 2017-2019 ACE 900 Service Manual
NOTE
NOTE
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ace 900 2018Ace 900 2019Ace 900 xc 2017

Table of Contents