ITech IT6000B Series User Manual page 143

Regenerative power system
Hide thumbs Also See for IT6000B Series:
Table of Contents

Advertisement

Power Supply Function
TEST-04
This test is a simulation of a load dump situation where voltage transients occur
following a sudden reduction in the load current drawn from a generator, motor-
generator or DC/DC converter and whilst the battery is either out of circuit or
incapable of absorbing power.
The waveform is as follows:
Copyright © Itech Electronic Co., Ltd.
131

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IT6000B Series and is the answer not in the manual?

Table of Contents