Hardware Options; Rkmt-J05 Equipment Rack Brackets Kit; Brkt-J23 Wall Brackets Kit; Figure 19: Rkmt-J05 Equipment Rack Brackets Kit For The X330-10Gtx Switch - Allied Telesis x330 Series Installation Manual

Fanless gigabit layer 3 access switches
Hide thumbs Also See for x330 Series:
Table of Contents

Advertisement

Hardware Options

RKMT-J05
Equipment Rack
Brackets Kit
Eight M3x6mm truss
head screws
BRKT-J23 Wall
Brackets Kit
The following hardware options for the x330 Switches are sold separately.
Installing the x330-10GTX Switch in a standard 19-inch equipment rack
requires the RKMT-J05 brackets kit. Refer to Figure 19. For instructions,
refer to Chapter 3, "Installing the x330-10GTX Switch in an Equipment
Rack" on page 57.
Two handles
Two long brackets
Eight M4x6mm truss
Figure 19. RKMT-J05 Equipment Rack Brackets Kit for the x330-10GTX
The x330-10GTX Switch is installed on a wall with the BRKT-J23 wall
brackets kit. Refer to Figure 20. For instructions, refer to Chapter 6,
"Installing the x330-10GTX Switch on a Wall" on page 75.
Figure 20. BRKT-J23 Wall Brackets Kit for the x330-10GTX Switch
x330 Series Installation Guide for Standalone Switches
head screws
Switch
Two short brackets
Two cable trays
Ten Tie Wraps
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents