Installing the x330-10GTX Switch

Here are the required tools and material for installing the switch on a
wooden or concrete wall with the BRKT-J23 brackets:
One or two BRKT-J23 bracket kits
Four or eight wall screws (not provided)
Cross-head screwdriver (not provided)
Stud finder for a wooden wall, capable of identifying the middle of
wall studs and hot electrical wiring (not provided)
Depending on the wall material these items might also be required:
Drill for pre-drilling the holes (not provided)
Four or eight wall anchors (not provided)
Caution
The supplied screws and anchors may not be appropriate for all wall
material. A qualified building contractor should determine the
appropriate hardware requirements for your wall before installing the
switch.  E88
Please review "Reviewing Safety Precautions" on page 40 and "Choosing
a Site for the Switch" on page 44 before performing this procedure. This
procedure requires two people.
Warning
The device is heavy. Use both hands to lift it. You might injure
yourself or damage the device if you drop it.  E94
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall. 
E105
Depending on the selected wall location for the switch, it may be easier to
verify the switch and connect the cables to the ports before mounting the
device on the wall. If this is true for your installation, perform the
procedures in Chapter 8, "Verifying the Switch" on page 95 and Chapter 9,
"Cabling Copper and SFP+ Ports" on page 105 before performing this
procedure.
x330 Series Installation Guide for Standalone Switches
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents