Introduction; Figure 33: X330-20Gtx Switch With Rkmt-J13 Equipment Rack Brackets Kit - Allied Telesis x330 Series Installation Manual

Fanless gigabit layer 3 access switches
Hide thumbs Also See for x330 Series:
Table of Contents

Advertisement

Chapter 4: Installing the x330-20GTX Switch in an Equipment Rack

Introduction

66
Installing the x330-20GTX Switch in a standard 19-inch equipment rack
requires the RKMT-J13 equipment rack brackets kit. The kit allows you to
install the switch with its front panel flush with or recessed 50mm (2 in.)
behind the front of the equipment rack. Refer to Figure 33. The kit is sold
separately.
Figure 33. x330-20GTX Switch with RKMT-J13 Equipment Rack Brackets
Note
The x330-28GTX Switch comes with two equipment rack brackets.
You can install the switch in an equipment rack with the two brackets
included with the unit, or the RKMT-J13 kit.
Kit

Advertisement

Table of Contents
loading

This manual is also suitable for:

X330-10gtxX330-20gtxX330-28gtx

Table of Contents