Technical Explanation > Embedded RDS > E-RDS Setup > Steps to E-RDS settings
2. Select #CLEAR > ERDS-DAT and touch the [OK] button.
NOTE:
This operation initializes the E-RDS settings to factory setting values.
For the setting values to be initialized, see the section of "Initializing E-RDS settings".
3. Perform installation or deletion of the CA certificate if necessary, and reboot the device.
• Installation of the CA certificate: Perform installation from Remote UI.
• Deletion of the CA certificate: When the following operation is performed, the CA certificate
in the factory setting is automatically installed.
CAUTION:
After following procedure, the registered key and CA certificate are deleted, and only
the CA certificate installed at the time of shipment is registered.
It is therefore necessary to check with the user in advance.
(1) Start [Service Mode].
(2) Select #CLEAR > CA-KEY and touch the [OK] button.
(3) Reboot the device.
CAUTION:
If a key and a CA certificate have been registered in order to use a function other than
E-RDS, it is necessary to register again from Remote UI.
4. Start [Service Mode]. (See 1. for the procedure.)
5. Select #E-RDS > E-RDS SWITCH, and set value "1" then touch [OK].
NOTE:
This operation enables the communication function with UGW.
CAUTION:
The following settings i.e. #E-RDS > RGW-ADDRESS and #E-RDS > RGW-PORT in
Service mode must not be change unless there are specific instructions to do so.
Changing these values will cause error in communication with UGW.
2
Technical Explanation > Embedded RDS > E-RDS Setup > Steps to E-RDS settings
6. Select #E-RDS > COM-TEST and then touch [OK].
NOTE:
This initiates the communication test between the device and the UGW.
If the communication is successful, "OK" is displayed. If "NG" (failed) appears, refer to the
"Troubleshooting" and repeat until "OK" is displayed.
NOTE:
The communication results with UGW can be distinguished by referring to the COM-
LOG. By performing the communication test with UGW, E-RDS acquires schedule
information and starts monitoring and meter reads operation.
2-81
2-81

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imagerunner 1740 seriesImagerunner 1730 series

Table of Contents