2
Technical Explanation > Original Exposure and Feed System > Control of ADF > Delivery Operation
● Downstream Reversal Feed Operation
After the back side of the original is read, the flapper solenoid 1 (SL7) turns on to feed the
original to the downstream reversal path using the delivery reversal flapper 1. Then, the
original is delivered with the reversal roller and delivery roller.
1)
The flapper solenoid 1 turns on to feed the original to the downstream reversal path.
Delivery reversal flapper 1
Flapper solenoid 1: ON
2)
After being fed by the specified distance in the downstream reversal path, the original
stops.
Reversal roller
3)
The reversal roller turns in the reverse direction to deliver the original.
Delivery roller
2
Technical Explanation > Original Exposure and Feed System > Control of ADF > Delivery Operation
F-2-38
F-2-39
F-2-40
■ Delivery Operation
After being read, the original is delivered to the original delivery tray using the delivery
reversal roller and delivery roller.
1)
The flapper solenoid 1 turns off and the flapper solenoid 2 turns off to feed the original.
Delivery reversal flapper 1
Flapper solenoid 1: OFF
2)
The original is delivered to the original delivery tray.
Delivery reversal flapper 2
Flapper solenoid 2: OFF
F-2-41
Original delivery tray
F-2-42
2-24
2-24