Advertisement

4. Mount the inner boom sensor assemblies using 2-1/16" W x 3" L x 3/8" thread U-bolts and 3/8"-16 flanged lock
nuts.
FIGURE 3. Inner Boom Sensor Installed (120' Steel Boom Shown)
NOTE:
For other boom configurations where the sensor assembly doesn't fit between the rails, mount the
sensor behind the boom.
5. Mount the center sensor assembly to the middle of the center rack using 2-1/16" W x 3" L x 3/8" thread U-bolts
and 3/8"-16 flanged lock nuts.
FIGURE 4. Center Sensor Installed
016-0236-001 Rev. E
Sensor Between Tubes
SENSOR INSTALLATION