Page 1
Case IH Patriot 2240/2250 AutoBoom™ Installation Manual Manual No. 016-0230-114 Rev A 10/18 E32228 Copyright 2018...
Page 2
Raven systems, or products used as components of systems, which rely upon the reception of these signals or availability of these services. Raven Industries accepts no responsibility for the use of any of these signals or services for other than the stated purpose.
Mount the Gauge Wheels ..............................14 Install the UltraGlide Wiring ..................... 16 Install the AutoBoom Node .............................16 Connect the Harness to the AutoBoom Valve ......................16 Connect the Harness to the Hydraulic Interface ......................17 Connect Power and CAN ..............................17 Connect the Harness to the Sensors ..........................18...
Page 4
Table of Contents Case IH Patriot 2240/2250 AutoBoom™ Installation Manual...
• Ensure AutoBoom is disabled prior to starting any maintenance work on AutoBoom or the machine. WARNING • When starting the machine for the first time after installing AutoBoom, be sure that all persons stand clear, in case a hose has not been properly tightened.
HAPTER HYDRAULIC SAFETY • Raven Industries recommends that appropriate protective equipment be worn at all times when working on the hydraulic system. • Never attempt to open or work on a hydraulic system with the equipment running. Care should always be taken when opening a system that has been previously pressurized.
FIGURE 1. Case IH 2250 PREPARING FOR INSTALLATION Before installing AutoBoom, park the machine where the ground is level, clean, and dry. Leave the machine turned off for the duration of the installation process. During the installation process, follow good safety practices. Be sure to carefully read the instructions in this manual as you complete the installation process.
• Upon installation of the AutoBoom system, operate the boom and center rack raise/lower functions through the machine’s manual control functions first before operating them via the AutoBoom controller/field computer to ensure the hydraulic system has been installed correctly and air is released from the system.
ULTRAGLIDE KIT CONTENTS This section contains a list of kits that may be included in the UltraGlide AutoBoom system. Before beginning the AutoBoom installation, compare the items in the AutoBoom kit listed in the Appendix A, Kits Lists with the items received with the shipment.
INSTALL FITTINGS ON THE AUTOBOOM VALVE Before mounting the AutoBoom valve on the machine, install the proper fittings on the valve. This prepares the valve for installation and simplifies the hose connection process later in the procedure. Refer to the following table to install the fittings in the appropriate ports of the AutoBoom valve.
Page 13
4. Connect the 90° end of the supplied hydraulic hose to the 90° end of the installed tee fitting. 5. Connect the straight end of the installed hydraulic hose to Port P on the AutoBoom valve. 6. Disconnect the machine’s tank line from the machine’s hydraulic valve.
4. Install the 90° end of the supplied hydraulic hose on the 90° end of the installed tee fitting. 5. Connect the straight end of the installed hydraulic hose to the fitting installed in Port RC of the AutoBoom valve.
ULTRAGLIDE 8. Connect the straight end of the installed hydraulic hose to the fitting installed in Port LC of the AutoBoom valve. INSTALL THE LEFT AND RIGHT DOWN HOSES FIGURE 5. Left and Right Down Hoses Installed 1. Disconnect the machine’s left and right cylinder return hoses from the machine’s hydraulic valve.
ULTRAGLIDE INSTALL THE ULTRAGLIDE SENSORS BOOM SENSOR MOUNTING LOCATIONS Sensor mounting locations may be influenced by the boom configuration. If an object enters the sensor’s blind range unexpectedly, a false echo return to the sensor could occur, causing the boom to drop and the sensor or boom to be damaged.
The wheels should be mounted outside of the boom fold, but inside of the boom breakaway. MOUNT THE GAUGE WHEELS 1. Remove the nuts from the right wheel axle (P/N 063-0131-567). Case IH Patriot 2240/2250 AutoBoom™ Installation Manual...
Page 19
ULTRAGLIDE FIGURE 9. Gauge Wheel Installed 2. Place the wheel (P/N 322-0131-008) on the right wheel axle. 3. Reinstall the lug nuts on the wheel axle to secure the wheel. 4. Mount the right wheel receiver bracket (P/N 116-0159-544) to the front of the right boom using four U-bolts, and eight flanged nuts.
3. Tighten the bolt on the node connectors to secure the connections. CONNECT THE HARNESS TO THE AUTOBOOM VALVE 1. Locate the LH Press and RH Press connectors on the harness cable.Route the connectors to the AutoBoom valve (P/N 063-0131-124).
1. Locate the 2-pin power connection on the rate control harness at the center section. 2. Disconnect the existing connection. 3. Connect the AUX PWR and LOGIC PWR connectors of the AutoBoom node harness so they are in-line with the existing 2-pin power connection.
6. If equipped, connect the INNER SENSOR connection to the inner ultrasonic sensor. If not equipped, leave the dust cap installed. 7. Repeat step 3 to step 6 for the right side of the boom using the RIGHT SENSORS connection on the AutoBoom node cable.
R EPLACEMENT PARTS CHAPTER C H A P T E R 4 This section contains replacement part diagrams for PowerGlide, PowerGlide Plus, and UltraGlide systems. Refer to these diagrams when calling to request replacement parts. Manual No. 016-0230-114 Rev A...
TABLE 1. AutoBoom Installation Kits Kit Description Kit Number Kit, Wheel, AutoBoom, Case IH, 90’ - 100’ Boom, Straight Axles 117-0138-017 Kit, ISO AutoBoom, Case IH Patriot 22XX, 80’/90’ Boom, W/Custom Sensor Cables 117-0138-081 Kit, Upgrade, Dual Sensor, No Cables 117-0138-085...
Page 28
FRACTIONS + 1/16 KIT, WHEEL, ANGLES + 0° -30' THIS DRAWING AND THE INFORMATION BREAK EDGES .005-.015 PROVIDED ARE PROPERTY OF RAVEN AUTOBOM, INDUSTRIES INC., AND MAY ONLY BE USED AS AUTHORIZED BY RAVEN INDUSTRIES INC. CASE IH, 90'-100' BOOM,...
Page 29
PROPRIETARY AND CONFIDENTIAL INFORMATION OF RAVEN INDUSTRIES INC. THIS DRAWING AND THE INFORMATION HEREON ARE RAVEN INDUSTRIES INC. PROPERTY AND 14979 MAY BE USED BY OTHERS ONLY AS AUTHORIZED IN WRITING BY RAVEN INDUSTRIES INC. - ALL RIGHTS RESERVED UNDER THE COPYRIGHT LAWS.
Page 30
PROPRIETARY AND CONFIDENTIAL INFORMATION OF RAVEN INDUSTRIES INC. THIS DRAWING AND THE INFORMATION HEREON ARE RAVEN INDUSTRIES INC. PROPERTY AND 14979 MAY BE USED BY OTHERS ONLY AS AUTHORIZED IN WRITING BY RAVEN INDUSTRIES INC. - ALL RIGHTS RESERVED UNDER THE COPYRIGHT LAWS.
Page 31
PPENDIX Case IH Patriot 2240/2250 AutoBoom™ Installation Manual...
Page 32
Hoses Safety Installing Left and Right Down Hoses Installing the Pressure and Tank Hoses Hydraulic Mounting the AutoBoom Valve Fittings Safety Removing the Orifice Fittings Sensors 13 Boom Sensor Mounting Locations Mounting the Boom Sensors Mounting the Center Rack Sensor...
Page 33
Index Case IH Patriot 2240/2250 AutoBoom™ Installation Manual...
Page 34
Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility.
Page 35
Bring the defective part and proof of purchase to your Raven dealer. If the dealer approves the warranty claim, the dealer will process the claim and send it to Raven Industries for final approval. The freight cost to Raven Industries will be the customer’s responsibility.
Need help?
Do you have a question about the AutoBoom and is the answer not in the manual?
Questions and answers