Feature
Clearance depth behind front
mounting plane
Clearance width between front
and rear mounting planes
Minimum clearance for service
access
Server node dimensions
Storage shelf dimensions
Installing the System Into a Rack
Procedures describing how to install the various Oracle Database Appliance models
into a rack.
Caution:
Personal injury or equipment damage. Always load equipment into a rack
from the bottom up so that it will not become top-heavy and tip over. Deploy
your rack's anti-tilt bar to prevent the rack from tilting during equipment
installation.
•
Installing Oracle Database Appliance X9-2S/X9-2L Into a Rack
Procedures describing how to install Oracle Database Appliance X9-2S/X9-2L into
a rack.
•
Installing Oracle Database Appliance X9-2-HA Into a Rack
Procedures describing how to install Oracle Database Appliance X9-2-HA into a
rack.
Installing Oracle Database Appliance X9-2S/X9-2L Into a Rack
Procedures describing how to install Oracle Database Appliance X9-2S/X9-2L into a
rack.
•
Contents of the Shipping Container
A listing of the ship container contents of Oracle Database Appliance X9-2S/
X9-2L.
Oracle Database Appliance
X9-2S/X9-2L
Distance to rear cabinet door is
at least 900 mm (35.43 in) with
the cable management arm, or
800 mm (31.5 in) without the
cable management arm.
Distance between structural
supports and cable troughs is at
least 456 mm (18 in).
Front clearance: 123.2 cm (48.5
in)
Rear clearance: 91 cm (36 in)
Physical Specifications for
Oracle Database Appliance X9-2
Series
N/A
Chapter 4
Installing the System Into a Rack
Oracle Database Appliance
X9-2-HA
Distance to rear cabinet door is
at least 900 mm (35.43 in) with
the cable management arm, or
800 mm (31.5 in) without the
cable management arm.
Distance between structural
supports and cable troughs is at
least 456 mm (18 in).
Front clearance: 123.2 cm (48.5
in)
Rear clearance: 91 cm (36 in)
Physical Specifications for
Oracle Database Appliance X9-2
Series
Physical Specifications for
Oracle Database Appliance X9-2
Series
4-6