Oracle Database Appliance X9-2S/X9-2L

Optional Component Installation

Safety Precautions When Rackmounting
ESD Precautions
Rack Compatibility Requirements
Contents of the Shipping Container
Tools and Equipment Needed
Stabilize the Rack for Installation
Installing the Server Into a Rack
Optional Component Installation
Learn about the optional components supported for the various Oracle Database
Appliance models.
Optional memory can be purchased independent of the standard configuration and is
shipped separately. Where possible, optional memory should be installed before you
install the server in a rack.
DIMM memory kits:
Refer to the Service Manual for instructions on installing memory.
Storage drives:
For Oracle Database Appliance X9-2S, you have the option of ordering
memory expansion to 512 GB. Memory kits come in sets of 8 x 32 GB DIMMs.
For Oracle Database Appliance X9-2L with 512 GB of base memory:
*
You have the option of ordering memory expansion to 1 TB. Memory kits
come in sets of 8 x 32 GB DIMMs, which means you need two kits (one
for each processor).
*
Or, if you need 2 TB of memory, you can replace your 32 GB DIMMs with
64 GB DIMMs. Memory kits come in sets of 16 x 64 GB DIMMs, which
means you need two kits (one for each processor).
For Oracle Database Appliance X9-2-HA with 512 GB of base memory:
*
You have the option of ordering memory expansion to 1 TB per server
node. Memory kits come in sets of 8 x 32 GB DIMMs, which means you
need four kits (two for each server node) for 1 TB. Both server nodes must
have the same amount of memory. Thus, the total memory for the
appliance becomes 2 TB.
*
Or, if you need 2 TB of memory per server node, you can replace your 32
GB DIMMs with 64 GB DIMMs. Memory kits come in sets of 16 x 64 GB
DIMMs, which means you need four kits (two for each server node).
Oracle Database Appliance X9-2-HA
Optional Component Installation
Safety Precautions When Rackmounting
ESD Precautions
Rack Compatibility Requirements
Contents of the Shipping Pallet
Installation Sequence
Verify Component Compatibility
Tools and Equipment Needed
Stabilize the Rack for Installation
Applying Labels
Installing the Storage Shelves Into a Rack
Add a Storage Expansion Shelf to an Existing
System
Installing the Server Nodes Into a Rack
Chapter 4
Optional Component Installation
4-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

X9-2sX9-2lX9-2-ha