Server Overview - Oracle SPARC T8-1 Installation Manual

Hide thumbs Also See for SPARC T8-1:
Table of Contents

Advertisement

Server Overview

Step
Description
5.
Take safety and ESD precautions and assemble the required
tools.
6.
Install any optional components into the server.
7.
Install the server into a rack.
8.
Attach data and management cables to the server.
9.
Connect the power cords to the server, configure the Oracle
ILOM on the SP, power on the server for the first time, and set
up the operating system.
Related Information
SPARC T8 Series Servers Product Notes
SPARC T8-1 Server Safety and Compliance Guide
SPARC T8 Series Servers Administration Guide
SPARC T8-1 Server Service Manual
Server Overview
This topic provides a high-level introduction to the main components and capabilities of the
server.
10
SPARC T8-1 Server Installation Guide • June 2019
Links
"Rear Panel Components" on page 13
"Handling Precautions" on page 17
"ESD Precautions" on page 17
"Tools Needed for Installation" on page 18
"Optional Components" on page 25
"Installing the Server" on page 25
"Connect Cables" on page 51
"Powering On the Server for the First Time" on page 51

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC T8-1 and is the answer not in the manual?

Questions and answers

Table of Contents