Oracle SPARC T8-1 Installation Manual page 46

Hide thumbs Also See for SPARC T8-1:
Table of Contents

Advertisement

Attach the CMA to the Server
Note -
remove the latching bracket so that you can remove connector D.
9.
Gently tug on the left side of the CMA's slide bar to verify that connector D is
properly seated.
Note -
remove the latching bracket so that you can remove connector D.
10.
Gently tug on the four CMA connection points to ensure that the CMA
connectors are fully seated before you allow the CMA to hang by its own weight.
11.
Verify that the slide rails and CMA operate properly.
See
"Verify Operation of Slide Rails and CMA" on page
Related Information
"Prepare the CMA for Installation" on page 38
"Secure Cables to the CMA" on page 60
46
SPARC T8-1 Server Installation Guide • June 2019
The slide rail latching bracket has a green release tab. This tab is used to release and
The slide rail latching bracket has a green release tab. This tab is used to release and
47.

Advertisement

Table of Contents
loading

Table of Contents