Oracle SPARC T8-1 Installation Manual page 48

Hide thumbs Also See for SPARC T8-1:
Table of Contents

Advertisement

Verify Operation of Slide Rails and CMA
When the server is fully extended, you must release two sets of slide rail stops to return the
server to the rack.
a.
The first set of stops are levers, located on the inside of each slide
rail, just behind the rear panel of the server. Push in both green levers
simultaneously and slide the server toward the rack.
The server slides in approximately 18 inches (46 cm) and stop.
Verify that the cables and the CMA retract without binding before you continue.
b.
The second set of stops are the slide rail release buttons, located near the
front of each mounting bracket. Simultaneously push both of the green slide
rail release buttons, and push the server completely into the rack until both
slide rail locks engage.
Adjust the cable straps and CMA, as required.
5.
Related Information
"Attach the CMA to the Server" on page 41
48
SPARC T8-1 Server Installation Guide • June 2019

Advertisement

Table of Contents
loading

Table of Contents