Server Overview
Step
Description
6.
Install the server into a rack.
7.
Attach data and management cables to the server.
8.
Connect the power cords to the server, configure the Oracle
ILOM SP, power on the server for the first time, and set up the
operating system.
Related Information
SPARC T7-4 Server Product Notes
■
SPARC T7-4 Server Safety and Compliance Guide
■
SPARC T7 Series Servers Administration Guide
■
SPARC T7-4 Server Service Manual
■
Server Overview
This topic provides a high-level introduction to the main components and capabilities of the
server.
12
SPARC T7-4 Server Installation Guide • March 2017
Links
"ESD Precautions" on page 25
"Tools Needed for Installation" on page 26
"Installing the Server" on page 29
"Connecting Cables" on page 51
"Powering On the Server for the First Time" on page 65