Oracle SPARC T8-1 Installation Manual page 75

Hide thumbs Also See for SPARC T8-1:
Table of Contents

Advertisement

installing cables, 41
kit, 25
racks, supported, 26
safety warnings, 27
slide rail assemblies, stops, releasing, verify
operation, 47
stabilizing the rack, 28
rear panel components, 13
S
SAS connector pinouts, 58
SER MGT port
cabling, 51
pinouts, 56
server
overview, 9
Server OK LED, 12
service clearance, 19
service processor
show command, 68
Service Required LED, 12
shipping carton specifications, 19
shipping kit contents, 15
show /SP/network command, 68
show command, 68
sideband management, 51, 51
site planning specifications, 19
slide rail
lock, 29
release, 29
slide rail assemblies
disassembling, 29
installing, 29
stops, 47
SP Fault LED, 12
specifications, 19
acoustic, 21
altitude, 21
current, 20
electrical, 20
elevation, 21
environmental, 21
frequency, 20
heat dissipation, 20
humidity, 21
physical, 19
power, 20
temperature, 21
vibration, 21
voltage, 20
standby
mode, 51
status LEDs, 13
storage devices, 10
T
temperature specifications, 21
U
USB ports, 10
pinouts, 55
rear, 13
V
vibration specifications, 21
video connector, 10
location, 13
pinouts, 58
video port, 10
voltage specifications, 20
W
weight specification, 19
width specification, 19
Index
75

Advertisement

Table of Contents
loading

Table of Contents