Server Overview
Step
Description
6.
Install any optional components into the server.
7.
Install the server into a rack.
8.
Attach data and management cables to the server.
9.
Connect the power cords to the server, configure the Oracle
ILOM on the SP, power on the server for the first time, and set
up the operating system.
Related Information
SPARC T7-1 Server Product Notes
■
SPARC T7-1 Server Safety and Compliance Guide
■
SPARC T7 Series Servers Administration Guide
■
SPARC T7-1 Server Service Manual
■
Server Overview
This topic provides a high-level introduction to the main components and capabilities of the
server.
10
SPARC T7-1 Server Installation Guide • October 2015
Links
"Tools Needed for Installation" on page 24
"Optional Components" on page 25
"Installing the Server" on page 25
"Connecting Cables" on page 51
"Powering On the Server for the First Time" on page 65
Need help?
Do you have a question about the SPARC T7-1 and is the answer not in the manual?
Questions and answers