1.5
Power Supply Unit
This unit can be installed on a bulkhead, wall or on the floor.
1.5.1
Installation considerations
Keep in mind the following points when selecting a location.
• Locate the Processor Unit away from heat sources because of heat that can build
up inside the cabinet.
• Select a location where the vibration is minimal.
• Locate the equipment away from places subject to water splash and rain.
• Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
• A magnetic compass will be affected if the Processor Unit is placed too close to the
magnetic compass. Observe the compass safe distances in the SAFETY IN-
STRUCTIONS to prevent interference to a magnetic compass.
• Install the Processor Unit on the floor, or on a bulkhead referring to the following di-
rections. For bulkhead, the cable entry must face the deck.
Installation
on a
bulkhead
Installation
on a floor
• Connect the ground wire (IV-8sq, local supply) between the earth terminal on the
chassis and the ship's earth, using the supplied crimp-on-lug FV2-4 BLU.
OK
OK
1. INSTALLATION
: Cable entry
1-23