Furuno FAR-2228 Installation Manual page 87

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

5) Unfasten the cable band* on the front cov-
er. Pass the de-icer power cable through
the band then fasten the band. Connect
the cable to TB901 on the DE-ICER board
(03P9573), using the supplied crimp-on
lugs.
*: For the DE-ICER installation kit, unfas-
ten the cable band on the cover sup-
plied with the kit. (The original cover can
be discarded.)
6) Set the Voltage Setting switch according to the power source for the de-icer;
115 V or 230 V. The default setting is 230 V.
7) Apply power to the de-icer then press and hold the TEST button for about ten
seconds. Check that the heater gets hot and then release the TEST button.
8) Set the front cover with heater to the Antenna Unit. When fastening the front
cover, spread open the heater elements, lifting the base of the heater. Take
care not to hit the heater elements on the chassis or radiator.
9) Fasten the two heater elements to the chassis with removed four bolts at
step 1). Fasten the base of the heater with two bolts coated with the supplied
adhesive. Fasten the installation materials to each of the cover bolts.
10) Attach the supplied earth label over the earth label currently attached near the
grounding terminal.
M5 screw coated
M5 screw coated
with adhesive
with adhesive
Grounding terminal
Grounding terminal
2. WIRING
TB901
Cable band
Cable band
M5 screw
M5 screw
(Do not apply adhesive.)
(Do not apply adhesive.)
Fixing Shaft
Fixing Shaft
SD Heater
SD Heater
Fixing Plate
Fixing Plate
Cover Bolt
Cover Bolt
Earth label
2-33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents