Furuno FAR-2228 Installation Manual page 32

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

1. INSTALLATION
1.1.5
How to hoist the Antenna Unit (FAR-2x58)
The Antenna Unit may be assembled before hoisting it to the mounting platform. Do
one of the following to hoist the Antenna Unit. Attach shackles ( 20, local supply) to
the lifting fixtures to use belt slings. After the Antenna Unit is securely placed, remove
the shackles.
Also, hoist the Antenna Unit slowly. Hoisting swiftly may cause a damage to the an-
tenna radiator or damage the radiator chassis.
Method 1
Top view
Attach shackles so that
belt slings get crossed
as viewed from above.
Note: Do not hoist the Antenna Unit by hanging belt
slings around the radiator directly.
Method 2
Fasten one belt sling to both shackles, and pass the other belt sling around the stern
side of the radiator.
Lifting Fixture
1-6
Belt sling
Bow side of
the antenna
unit
Shackle
Shackle
Lifting Fixture
Belt sling
Note: Pass the belt
sling around the
stern side of the
radiator.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents