Furuno FAR-2228 Installation Manual page 51

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

• Install the Processor Unit on the floor, or on a bulkhead with the following direction.
For bulkhead, the cable entry must face the deck.
Installation
on a
bulkhead
Installation
on a floor
• Connect the ground wire (IV-8sq, local supply) between the earth terminal on the
chassis and the ship's earth, using the supplied crimp-on-lug FV2-M3 BLU.
1.6.2
How to install the Processor Unit
Use four bolts (M6, local supply) to
fasten the Processor Unit.
For bulkhead mounting, fasten two
bolts for the lower notches, leaving 5
mm of thread exposed from the bolt
head. Set the notches of the Proces-
sor Unit on the two bolts, then fasten
two bolts for the upper bolt holes.
Then secure the Processor Unit in
place with all four bolts fastened tight-
ly.
Note: For bulkhead installations, the cable entry must face the deck.
OK
OK
1. INSTALLATION
: Cable entry
Bolt holes
Notches
1-25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents