Furuno FAR-2228 Installation Manual page 88

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

2. WIRING
Note: If it is necessary to open the front cover after installing the DE-ICER kit, re-
move the de-icer power cable from the locking wire saddle shown in the following
figure then detach the cover slowly to prevent damage to the heater.
15. Reconnect the performance monitor connector (J807).
16. Check that the gasket on the front and rear cover is seated properly, then
close the covers. The torque for the fixing bolts must be 28.0 N•m.
Note: For the de-icer specifications, take care not to hit the heater elements on
the chassis or radiator. If the heater hits something, unfasten the fixing screws for
the heater to adjust the position of the heater. Then fix the heater again.
2.4.3
How to connect the cables for S-band (TR-UP, solid state) ra-
dar
Three cables are connected to the Antenna Unit: anttena, sub monitor* and de-icer*
power cables (*: option). The procedure shows how to connect all cables. Disregard
the descriptions for the optional equipment if not applicable.
Note: Apply the supplied adhesive to the unused cable glands.
If there is a chance of inclement
weather when the RF unit is
removed, cover the intakes on both
covers with packing tape for
waterproofing. Be sure to remove the
tape after completing the installation.
Some parts or wiring have been omitted from the illustrations for clarity.
2-34
FRONT
FRONT
REAR
REAR
NOTICE
Remove the de-icer power cable from the locking
Remove the de-icer power cable from the locking
wire saddle to open the front cover.
wire saddle to open the front cover.
De-icer power cable
Antenna cable
Sub monitor cable
Antenna motor switch
Intake

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents