Furuno FAR-2228 Installation Manual page 78

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

2. WIRING
1) Set a locking wire saddle (supplied) at locations (B) and (C) shown in the fol-
lowing figure. Pass the de-icer power cable through the locking wire saddles
(A) through (C) and pull it to the front side.
2) Unfasten the cable band* on the
front cover. Pass the de-icer power
cable through the band then fasten
the band. Connect the cable to
TB901 on the DE-ICER board
(03P9573), using the supplied
crimp-on lugs.
*: For the DE-ICER installation kit,
3) Set the Voltage Setting switch according to the power source for the de-icer;
115 V or 230 V. The default setting is 230 V.
4) Apply power to the de-icer then press and hold the TEST button for about ten
seconds. Check that the heater gets hot and then release the TEST button.
5) Coat the gasket (all brims) of the intake with the supplied oil compound. Be
sure to coat the gasket completely.
Front cover, inside view
6) Set the front cover to the Antenna Unit. Take care not to hit the heater ele-
ments on the chassis or radiator.
2-24
FRONT
FRONT
unfasten the cable band on the
supplied cover. (The original cov-
er can be discarded.)
( C )
( B )
Cable band
Cable band
Oil compound
( A )
( B )
( C )
TB901
Brim
Brim

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents