Furuno FAR-2228 Installation Manual page 39

Hide thumbs Also See for FAR-2228:
Table of Contents

Advertisement

1.2.3
How to hoist the Antenna Unit
The Antenna Unit may be assembled before hoisting it to the mounting platform. At-
tach lifting belt slings to the "Antenna Support", NOT the antenna radiator, as shown
in the figure below.
Also, hoist the Antenna Unit slowly. Hoisting swiftly may cause a damage to the anten-
na radiator or damage the radiator chassis.
There are two methods to hoist the Antenna Unit.
Method 1
Set belt slings to
antenna support.
Method 2
Fasten the belt sling to a shackle, pass the belt sling around the antenna support and
fasten the other end of the belt sling to the other shackle.
Shackle
Shackle
(left, right)
(left, right)
Lifting fixture
Lifting fixture
OK
Belt sling
(ø20)
(ø20)
Antenna
Support
Belt sling
Belt sling
Bow side UP
1. INSTALLATION
Antenna support
Antenna support
Note: Pass the belt sling
around the
Antenna Support.
1-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents