Tandberg Data Autoloader Tandberg LTO2 Installation And User Manual page 45

Tandberg data tandberg lto2 autoloader installation and user's manual
Table of Contents

Advertisement

Press the ENTER key and define the command.
Operation 6
Display; Lib.ID?
Press the arrow key and select "Drv. ID?" command.
Operation 7
Display: Drv. ID?
Press the ENTER key and define the command.
Operation 8
Display; Drv. ID 0?
Press the arrow key and select "Drv. ID 5" command.
Operation 9
Display: Drv. ID 5?
Press the ENTER key and define the command.
Operation 10
Display: Complete
Set the power switch of this device to OFF.
Operation 11
Operation 12
Switch the power of this device ON again.
Operation 13
Wait for the completion of the power-on test.
Display: "READY" and "DRV empty" are alternately displayed
Operation 14
Check the "READY" display and then switch on the power of the
server/workstation and the other devices to restart the system.
Important
When changing the SCSI ID of this device, be certain to execute a restart of
this device, the server/workstation, and any other devices. Note that the restart
of the server/workstation and the other devices should be executed after
checking the "READY" display of this device.
- 29 -

Advertisement

Table of Contents
loading

Table of Contents