9. Set the programming mode.
Note: Refer to the controller operation manual
TP-5829 as needed.
a. Press the Reset Menu key on controller
keypad.
b. Go to Menu 11, Programming Mode, and press
the down arrow key to Programming Mode.
If Programming Mode—Local is shown, go to
step 10.
If Programming Mode—Local is NOT shown,
press the right arrow key to select Local. Press
YES and the Enter key.
c. Enter the access code. The factory default
access code is the number 0. Press the Enter
key.
10. Verify the generator set system values.
Note: Refer to the controller operation manual
TP-5829 as needed.
a. Press the Reset Menu key on controller
keypad.
b. Go to Menu 6, Generator System, and press
the down arrow key to System Voltage.
c. Use the numeric and/or YES/NO keys and then
press the Enter key to add the data each
corresponding display shown in Figure 4-5.
Press the down arrow key to access the next
display. Use the right arrow key for the three-
phase/single-phase entry.
Note: During step 1, the user should have
recorded the values for Menu 6. The
user must define these values for
purposes of calibrating the controller.
11. Calibrate.
Note: Refer to the controller operation manual
TP-5829 as needed for generator set
starting and stopping procedures.
a. Verify that the controller master switch is in the
OFF position.
b. Press the Reset Menu key on controller
keypad.
c. Go to Menu 9, Calibration and press the down
arrow key to Auto-Zero? See Figure 4-8.
TP-6356 4/12
Menu 9
CALIBRATION
AUTO-ZERO?
L1-L2 VOLTS
L2-L3 VOLTS
L3-L1 VOLTS
L1-L0 VOLTS
L2-L0 VOLTS
L3-L0 VOLTS
L1 AMPS
L2 AMPS
L3 AMPS
RESISTIVE LOAD?
BATTERY VDC
Figure 4-8 Menu 9, Calibration
d. Press YES and the Enter key.
e. Connect a resistive load bank to the generator
set output leads. The load bank must be rated
for the generator set standby nameplate rating.
If the resistive load bank does not have
metering, connect an RMS voltmeter and
ammeter to each corresponding generator set
output lead connection under calibration.
f. Place the controller master switch to the RUN
position to start the generator set. Allow the
generator set to run for 5--10 minutes to reach
operating temperature.
g. Record the L1--L2 voltage from the resistive
load bank or connect an RMS voltmeter to
L1--L2 output leads if the resistive load bank is
not meter equipped.
Section 4 Decision-Makerr 340 Controller
00
00
00
00
00
00
00
00
00
Y/N