Agilent Technologies 5975T LTM GC Operation Manual page 39

Table of Contents

Advertisement

Procedure
1 Load your maintenance method for cooling down the column enclosure. See
Be careful! The guard column heated enclosure or internal accessories may be hot
WA R N I N G
enough to cause burns. If either is hot, wear heat-resistant gloves to protect your
hands or allow the parts to cool before beginning the work.
Always wear safety glasses when handling capillary columns. Use care to avoid
WA R N I N G
puncturing your skin with the end of the column.
Wear clean, lint-free gloves to prevent contamination of the parts.
C A U T I O N
2 Vent the MSD
3 Slide an interface nut and conditioned ferrule onto the free end of the
5975T LTM GC/MSD Operation Manual
"Column maintenance method"
(page
you can see the end of the GC/MSD interface.
guard column. The tapered end of the ferrule must point towards the nut.
on page 120.
97) and open the analyzer chamber
Installing LTM Columns
(page
99). Be sure
2
39

Advertisement

Table of Contents
loading

This manual is also suitable for:

5975t ltm msd

Table of Contents